Left Navigation

Call For Proposal for Development of Electric Vehicles (EVs) Sub-Systems

Worldwide automotive industry is quickly shifting from traditional fuel based technologies to eco-friendly technologies such as battery based drive train for development of Electric Vehicles (EVs) due to fast depletion of fossil fuel and to reduce impact of transportation on environment and climate change. Keeping in view the technological requirements of EVs and to increase the local manufacturing of the subsystem of EVs in India, a short term R&D programme is being initiated by Ministry of Electronics and Information Technology (MeitY) for the technology/product development for EVs in the areas such as motor, controller, converters etc, for 2 Wheeler (2W), 3Wheeler (3W)/e-Rickshaw. This initiative is expected to deliver indigenous EVs subsystems at lower cost and also contributing to Make in India initiatives.

Objectives: To develop the Electric Vehicle sub-systems in the areas of Electric motor, controller, converters etc, for 2 Wheeler (2W), 3Wheeler (3W)/e-Rickshaw etc., indigenously. The expected outcome i.e. technology/product has to be cost effective, quality competitive and ready for commercialization. The Total duration of the Project should be of 18 months or less (including product development and commercialization), but the prototype must be ready and testing should start within 12 months.

Implementation modalities: EV sub-systems development has to be taken up in consortium mode comprising of Government R&D institutes/organization for the design and development, industry to commercialize it and vehicle manufacturer to use the developed products in the manufacturing. The R&D institutes/ organization would lead the projects and participating agencies are expected to contribute in the said development.

Proposals submission date: Proposals as per format (given at link:http://meity.gov.in/writereaddata/files/PROFORMA%20FOR%20SUBMITTING.pdf[PDF]0 bytes and Terms and Conditions given at link:http://meity.gov.in/writereaddata/files/Terms%26conditions.pdf[PDF]0 bytes) may be submitted within a month after publishing on MeitY website on the following address:

Shri Tara Shanker,
Scientist ‘F’ & HoD(ESDA),
R&D in Electronics Group,
Electronics Niketan, 6 CGO Complex, New Delhi-03
Phone: +91-11-24364736 (Office)
Fax: +91-11-24363082
Email: taras[at]meity[dot]gov[dot]in

The proposals should describe in details the idea, the proposed development plan along with the deliverables and timelines.

The intellectual Property Rights for the development work will be as per the policy of MeitY.

Note: MeitY reserves the right to accept or reject any proposal without assigning any reason thereof.